Infrastructure

I-5/

116th St. NE Interchange


The Tulalip Tribes and Washington State Department of Transportation have nearly completed the overpass widening at 116th St. NE.  The next phase includes full build out to a Single Point Urban Interchange.

I-5/88th St. NE Interchange


This project will convert the Interstate 5 and 88th St. NE Interchange to a full Single Point Urban Interchange.  The project is fully funded by the State.
116thSPUI

State Avenue 100th to 116th

All of State Avenue within the City limits is built out to 5-lanes except the segment between 100th St. NE and 116th St. NE.  The City has received State funding to complete this project.
StateAve100to116

88th Street Corridor Widening State Ave. to 67th Ave. NE


The 88th St. NE corridor is primarily a two lane roadway between State Ave. and 67th Ave. NE.  The project will include curb, gutter and sidewalk.  Bicycle lanes will be included from 67th Ave. NE to 51 Ave. NE, both planned bicycle routes.  Depending on available funding, the City plans on moving forward with design in 2017.
88thSt.Corridor

116th St. NE Safe Routes to School Sidewalks


The City will be constructing sidewalk improvements near Marshall Elementary School beginning in 2017.